(+86)-0755-89205789 丨  sales@stusupplychain.com                   NVOCC:MOC-NV09192 | FMC:030310

NEWS & BLOG

Ocean Freight Contracts Explained: BCO, NVOCC, FAK, FIX and NAC

Views: 0     Author: STU Supply Chain     Publish Time: 2026-11-21      Origin: Site

Junior freight forwarder at his desk quoting a FAK rate, with a container ship berthed at the terminal outside his window

Short answer: BCO, NVO and NAC answer who signed the contract with the carrier. FAK, FIX, commodity contracts, index-linked contracts and spot rates answer how the price is calculated and how long it holds. There are no "four parallel contract types." Every booking carries one label from each column — for example, "an NVO contract, priced on FAK, valid for two weeks" is a perfectly normal booking.

If you only remember one thing from this article, remember that. It is the difference between quoting a rate confidently and quoting a rate you cannot defend when the carrier asks whose contract it is on.

There is no such thing as the four types of ocean freight contracts. BCO, NVOCC and NAC answer who signed. FAK, FIX, commodity and index-linked rates answer how it is priced. Here is how to tell them apart before you sign.

A forwarder quoted you $6,850 for a 40HQ from Shanghai to Los Angeles. You put it next to two other quotes, picked the middle one, and moved on.

Six weeks later a detention invoice arrived for $1,700. The next booking on the same lane came back at $8,100. And when a customer asked why their name was not showing as shipper on the bill of lading, nobody had an answer ready.

None of that was bad luck. The $6,850 was a real rate. The $1,700 was a real charge. They came from two different contracts, and nobody told you which one you were looking at.

This is the part of ocean freight that gets skipped in most guides. Everyone explains what the abbreviations stand for. Almost nobody explains how to read them off a quote before you commit to a container.

The short answer

There is no such thing as "the four types of ocean freight contracts." Ocean freight contracts answer two separate questions, and the abbreviations people memorize belong to different questions.

Question 1 — Who signed with the carrier?

Question 2 — How is the rate set, and for how long?

BCO — the cargo owner signed directly

FAK — one flat rate, any commodity

NVOCC — a licensed consolidator signed

FIX — a rate locked for months

NAC — a specific named account is bound

Commodity — priced per product type

Index-linked — floats with a published index

Spot — one sailing, one price

One contract carries one answer from each column. A single booking can be an NVOCC contract, priced at FAK, valid for two weeks. Three labels, one document, no conflict.

Before you look at a single number on a quote, ask two things: whose contract is this, and does the name on it match mine? Everything else — the rate, the free time, the documentation, the peak-season space — follows from those two answers.

Hand-drawn card: an ocean freight contract pairs a signing party (BCO, NVO, NAC) with a pricing model (FAK, FIX, spot)

That is the whole architecture. The reason people misapply these terms is that they treat the two dimensions as one list of four items. A rate sheet can combine any "who" with any "how" — and does, every day.

Why almost everyone learns this wrong

Early in my career I was asked to quote a 40HQ from Shanghai to Los Angeles. I pulled a FAK number off the rate sheet and handed it over, feeling efficient.

The person reviewing it asked one question: "Which contract is this moving under?"

I did not know. Then: "Is it the shipper's own contract or a forwarder's contract? Does the name match?"

I did not know that either. I had a table in my head listing FAK, FIX, NVOCC and BCO as four parallel choices, and the table was wrong in its first cell. The more fluently I recited it, the more confidently I applied it to the wrong situation.

This is not a vocabulary problem. It is a structure problem, and it produces real invoices.

Dimension 1 — Who signed the contract

This dimension decides one thing: whether you are allowed to use the contract at all. Price comes later. Eligibility comes first.

BCO — Beneficial Cargo Owner

A BCO contract is signed directly between the cargo owner and the ocean carrier, with no intermediary holding the contract. The importer, the factory, the trading company or the brand is the contracting party.

Documentation follows automatically: the carrier issues a master bill of lading (MBL), and the shipper and consignee on that MBL must be the contracting party itself.

What you get in exchange for that direct relationship:

  • A rate that does not move every two weeks

  • Priority space allocation in peak season, contractually

  • Longer free time at destination

  • Better treatment on surcharges

  • Usually a named account contact at the carrier

What you pay for it:

  • A minimum quantity commitment (MQC) — a stated annual volume you promise to move

  • Penalty exposure if you miss it

  • A contract rate that can sit above the spot market when rates collapse

That last point is not theoretical. In a falling market, a BCO with a locked rate watches spot prices drop below their contract and has no way out except to underperform the MQC and absorb the penalty. The contract protects you in a rising market and traps you in a falling one. That is the deal.

For most small and mid-sized North American importers, the practical blocker is the MQC itself. Carriers are not interested in direct contracts below a certain annual volume. If nobody has offered you a BCO contract, that is usually why.

NVOCC — the wholesale layer

An NVOCC is defined by the Federal Maritime Commission as a common carrier that holds itself out to provide ocean transportation, issues its own house bill of lading, does not operate the vessels, and is treated as a shipper in its relationship with the vessel-operating carrier ([FMC, Ocean Transportation Intermediaries](https://www.fmc.gov/about/bureaus-offices/bureau-of-enforcement-investigations-and-compliance-beic/office-of-compliance/ocean-transportation-intermediaries/)).

In plain terms: an NVOCC buys space from the carrier at wholesale and resells it in smaller pieces. A large NVOCC aggregates the volume of hundreds of shippers, negotiates one rate with the carrier, and passes a share of that discount downstream. Your cargo rides on their contract, under their MQC, at their rate.

What that means for you:

  • You do not carry the MQC obligation — the NVOCC does

  • You can move two containers a month and still access contract-level pricing

  • You receive a house bill of lading (HBL), not the carrier's master bill

  • The shipper shown on that HBL is frequently the NVOCC, not your factory

That last bullet causes more damage than any other single fact in this article. It is covered in detail below.

NVOCCs operating in US trades are regulated. US-based NVOCCs must hold an FMC license under 46 CFR § 515.3, must demonstrate financial responsibility for cargo claims, and must publish a tariff under 46 CFR § 520.3. Foreign-based NVOCCs may register with the FMC instead of licensing, but still must post surety and publish a tariff. A forwarder who cannot tell you their FMC license or registration number is not an NVOCC you should be routing cargo through.

NAC — Named Account Contract

A NAC is a contract the carrier issues to an NVOCC but binds to one specific shipper or consignee name. The rate is usually better than the NVOCC's general buy rate, and the terms are usually stronger. The restriction is absolute: only the named account can use it.

NAC structures are common on the Trans-Pacific and on DDP and DDU lanes into the US, which is exactly where the incentive to misuse them is highest. A better rate sitting on a document that most shippers are not eligible to use is an invitation to shortcut, and shortcuts here have consequences.

BCO vs NVOCC vs NAC — who can use what

Item

BCO

NVOCC

NAC

Signed between

Carrier and cargo owner

Carrier and licensed NVOCC

Carrier and NVOCC, bound to a named account

Bill of lading issued

Master B/L (MBL)

House B/L (HBL)

HBL, named account only

Shipper shown on B/L

Must be the contracting cargo owner

Often the NVOCC

The named account

MQC obligation

Yours

The NVOCC's

The NVOCC's

Minimum volume to qualify

High

None — one container works

None, but you must be named

Rate level

Best, if you have the volume

Wholesale plus margin

Better than standard NVOCC

Peak season space

Contractually protected

Depends on the NVOCC's own allocation

Usually protected for the named account

Can be lent to another shipper

No

No, if it is a named NVOCC contract

Never

Typical user

Large importers and brands

Everyone else

High-volume accounts inside an NVOCC

Dimension 2 — How the rate is set, and how long it is locked

This dimension has nothing to do with who signed. It decides what you pay, how long that number survives, and what happens to it in peak season.

FAK — Freight All Kinds

One flat rate for a given lane and container type, regardless of what is inside. FAK is the retail price of ocean freight.

Validity is short — commonly one to two weeks. FAK is not available for dangerous goods, reefer, open-top or flat-rack cargo. Rate increases (GRI, general rate increase) tend to land at the start and middle of the month. Decreases are rarer than increases, which is a structural feature, not a coincidence.

FAK is also the lowest-priority cargo on the vessel when space is tight. That is the part people forget in July.

FIX — Fixed rate

A rate locked for a defined period, typically three to twelve months. FIX is not a fourth category of contract alongside BCO. It is a pricing mechanism, and it applies to monthly, quarterly and annual agreements alike.

You are buying certainty. In a rising market that is worth a great deal. In a falling market it becomes the most expensive line on your P&L, and the escape route is the MQC penalty. The math is worked through below, because almost nobody runs it before signing.

Commodity contract

Separate pricing for a single product category — furniture, apparel, food, chemicals. The rate is lower because the cargo is predictable to stow and handle. The condition is strict: the commodity description must match the contract exactly. "Furniture" does not cover furniture fittings, and a mismatch at the documentation stage can void the rate.

Index-linked contract

The rate is a published index multiplied by an agreed discount, reset monthly or quarterly. The most widely used reference in Asia-outbound trades is the Shanghai Containerized Freight Index, which is published at 15:00 Beijing time on each publication date, generally every Friday, with adjustments around public holidays ([Shanghai Shipping Exchange](https://en.sse.net.cn/indices/introduction_scfi_new.jsp)).

Index-linked pricing protects you when the market spikes and benefits you when it collapses. What you give up is budget certainty — you cannot put a fixed number in a cost model. For importers with thin margins and a board to answer to, that trade is often not worth it.

Spot

One sailing, one rate, no volume commitment. Maximum flexibility, minimum protection. In peak season, spot cargo is what gets rolled when the vessel is overbooked, and the price can move by four figures inside a month.

The structures that sit outside these five

  • Block space agreement — you reserve fixed slots on fixed sailings and pay for them whether you fill them or not

  • Seasonal contract — a base volume commitment plus a defined peak-season increment

  • Flexible contract — a loose MQC with a low penalty coefficient, used when volume is genuinely unpredictable

  • Space swap / VSA — carriers exchanging slots with each other; you benefit indirectly through the booking carrier

One clarification that saves embarrassment: FFA is not a shipping contract. A Forward Freight Agreement is a financial derivative used to hedge freight rate exposure. It cannot be used to book cargo. Putting an FFA into a customer proposal is a fast way to lose credibility with anyone who knows the difference.

Five pricing models compared

Model

How the rate is set

Typical lock period

Best used when

Main risk

FAK

Flat rate, any commodity

1–2 weeks

Irregular or one-off volume

No space protection in peak; rate resets at GRI

FIX

Negotiated and locked

3–12 months

Volume is stable and budget certainty matters

Rate inversion when the market falls

Commodity

Priced per product category

Per contract

Single-category, high-volume shipper

Description mismatch voids the rate

Index-linked

Index × agreed discount

Reset monthly or quarterly

Large accounts wanting market exposure without full risk

Cost cannot be budgeted precisely

Spot

Market rate per sailing

Single sailing

Urgent or seasonal top-up volume

Rolled, repriced, or both

The FIX contract math almost nobody runs

Here is the scenario, with round numbers so the structure is visible.

You sign a six-month FIX at $2,000 per 40HQ. Three months in, the market drops to $1,200. You have 60 containers left on the contract.

Two options, and both cost money:

Path

Calculation

Cost

Honor the contract

60 × ($2,000 − $1,200)

$48,000 above market

Walk away

MQC shortfall × penalty coefficient

Depends entirely on the coefficient you signed

That is why the penalty coefficient matters more than the headline rate. If the coefficient is 50% of the shortfall freight, walking away costs $24,000 and is the rational choice. If it is 100% plus a fixed fee, honoring the contract is cheaper and you spend six months paying above market.

Neither answer is knowable at signing time. What is knowable is the coefficient. Ask for it in writing, in the contract, before you sign — not in a phone call, and not in a side email.

Sign a FIX when you can absorb the downside or when your customer contract already fixes your sell rate. Do not sign one because the number looked good in a rising market.

Free time is where the money actually hides

This is the most under-negotiated term in the entire contract, and it is worth more than most rate differences.

Free time at destination is how many days you have before demurrage (container sitting in the terminal) and detention (container sitting outside the terminal, empty and not yet returned) start accruing. Industry reference ranges, which vary by carrier, port and season:

Indicative free time by contract type — confirm with the carrier in writing

Contract type

Typical destination free time

Daily charge after free time

BCO

21 days and above

Lower tier

NVOCC (general)

Around 14 days

Mid tier

FAK / spot

7–10 days

USD 170–260 per day for reefers; USD 90–180 for dry

Run the difference. A BCO contract at 21 days versus a FAK booking at 10 days is 11 days of buffer. At $50–100 per container per day, that is $550–1,100 per container in avoided exposure. Across 100 containers a year, $55,000–110,000.

That number does not appear on any quote sheet. It appears on the invoice six weeks later, after a customs exam, a chassis shortage, or a warehouse that could not take delivery on a Friday.

Two negotiation points that cost nothing to ask for:

  • Free time at destination, stated in days, in writing

  • Whether the free time clock starts at vessel arrival or at container availability — these are not always the same day, and the gap can be two or three days at a congested terminal

Documentation — where good deals break at the last mile

Original bill of lading, telex release and sea waybill on a desk, with a container terminal and a berthed vessel behind

Contracts come in two documentation modes: a paper original contract can issue any of the three, while a telex-only contract can issue telex release only.

Three release methods, and the contract type constrains which ones you can use.

Method

What it is

How cargo is released

Original B/L

Document of title, issued in a set of three originals

One original surrendered; the others void automatically

Telex release

Electronic release instruction

Carrier confirms release to the destination agent; no original needed

Sea waybill (SWB)

Non-negotiable transport document

Consignee identified by identity, no document required

Now the constraint. A contract issued on original terms supports all three release methods. A contract issued on telex-release terms supports telex release only.

That single line causes two of the most expensive errors in the trade:

Letter of credit plus telex-release contract. If your customer pays by L/C, the bank checks the bill of lading against the credit terms. On a telex-release contract, the shipper shown on the document may not be your customer, and the release method may not match the credit. That is a discrepancy, and a discrepancy means the bank does not pay. If your buyer pays by L/C, confirm the release method before booking, not after the draft B/L arrives.

Editing the shipper name on a released document. This happens more than anyone admits. Someone takes the PDF, changes the shipper field so the name "looks right," and forwards it. That is document alteration. When it surfaces — and it surfaces when the contract holder and the carrier have a dispute — the consequences land on the cargo in transit: investigation, penalty, container held. If you need the actual shipper to appear, use a structure that permits it: a dual-shipper contract where the real shipper appears in the description of goods, or a switch to original terms. There is no version of this where editing the PDF is the right answer.

Carrier restrictions on telex-release contracts differ widely and change without much notice. Before booking, get four answers in writing:

  1. Whose name is the contract under?

  2. Is my commodity inside the permitted range? (You must state the commodity when asking — a contract query without a commodity is unanswerable)

  3. Is telex release the only permitted release method?

  4. Are there restrictions on who can be consignee or notify party?

The US trade calendar is different from everywhere else

Two terminal gates joined by a shipping route, showing US service contracts effective 1 May and non-US contracts effective 1 January

1 May is the effective date, not the starting gun. Preparation belongs in Q1. NVOCC licensing and bond reviews are also audited more aggressively on US lanes, so have the paperwork ready before you need it.

This one costs people an entire contract year, and it happens because the US cycle runs opposite to the rest of the world.

On the Trans-Pacific, the annual contract is a Service Contract (SC), and it is the most formal instrument in the trade. The FMC defines it as an agreement between a shipper and an ocean common carrier in which the shipper commits to a minimum quantity of cargo over a fixed period, and the carrier commits to a rate or rate schedule and a defined level of service ([FMC](https://www.fmc.gov/complaints-and-assistance/how-to-file-service-contracts/)).

Service contracts must be filed confidentially with the FMC through SERVCON under 46 CFR Part 530. Since June 2021, original contracts may be filed up to 30 days after the effective date rather than before it — a change that reduced administrative friction but did not change the commercial calendar ([FMC Industry Advisory](https://www.fmc.gov/articles/industry-advisory-requirement-to-file-timely-and-accurate-service-contracts/)). Records must be retained for five years from contract termination and produced on request.

Other trades are looser. Each carrier publishes its own format for each lane, sometimes no more than a rate spreadsheet with notes. A rate agreed by email and confirmed as received can be sufficient to bind.

Contract negotiation calendar by trade

Trade

Negotiation opens

Effective date

All signatures complete

Trans-Pacific (US)

Mid-March

May 1

Mid-May

Non-US trades

Late November – December

January

Mid-January

The error is applying the non-US rhythm to the US. If you start preparing in December for a Trans-Pacific contract, you are not early. You are four months late, and the carrier's allocation for the year has already been divided.

Practical consequence: May 1 is an effective date, not a starting point. Preparation — volume history, lane forecast, MQC modeling, credit and bond documentation — has to be finished inside Q1. On the US trades, NVOCC licensing and bond status get reviewed more closely than on other lanes, so keep that paperwork current year-round rather than assembling it under deadline.

Peak season allocation and the annual review

Peak season is not a pricing problem. It is an allocation problem, and allocation is decided by which contract you are booked under.

In peak, book on contracts with protected space — BCO and NAC first, established NVOCC contracts second. Avoid FAK and spot unless the cargo genuinely cannot wait, because those are the bookings that get rolled when the vessel is full.

In the off-season, the logic inverts. Use spot and FAK to capture market lows, and hold FIX contracts for the volume you need to protect.

A workable split for most mid-sized importers is 70–80% of annual volume on long-term contracts for cost and space certainty, with 20–30% left on the spot market for flexibility. The exact ratio depends on how volatile your own order book is; a brand with 12-month purchase orders can carry more contract volume than a distributor buying against monthly demand.

One point that gets missed in nearly every negotiation: MQC runs both ways. You are penalized for under-delivering. The carrier is also obligated to provide the committed space and level of service, and failure on their side carries remedies too. Read the carrier's obligations as carefully as your own penalty clause. Very few shippers do, which is why very few shippers ever invoke them.

Then review once a year, before the negotiation window rather than after:

  • Did we hit the MQC? If not, why — volume shortfall, or routing decisions?

  • Is the contract rate above or below the market today?

  • Was the free time sufficient, or did we pay demurrage and detention we could have avoided?

  • Did the carrier deliver the space they committed to in peak?

Trans-Pacific: review in February, before the March window opens. Non-US trades: review in October, before the late-November window.

Ten checks before you sign

Pre-signature checklist

#

Check

Why it matters

1

Whose name is the contract under?

Determines whether you can legally use it at all

2

Is it a named contract, and does the name match mine exactly?

A near-match is a mismatch; carriers check the legal entity

3

What is the pricing mechanism and the validity period?

FAK resets in weeks; FIX locks for months

4

Is my commodity inside the permitted range?

Outside it, the rate does not apply and the booking gets rejected

5

Which release methods are permitted?

Telex-only contracts break L/C transactions

6

Are there consignee or notify party restrictions?

Some carriers exclude forwarders and customs brokers

7

What is the MQC, and what is the penalty coefficient?

This is the number that decides whether walking away is cheaper

8

Is the rate all-in, or does it exclude THC, documentation and fuel?

A cheap base rate plus surcharges can exceed a clean NVOCC quote

9

How many free days at destination, and when does the clock start?

Worth more than most rate differences across a year

10

On US trades, is it a Service Contract with signatures and an effective date?

FMC-regulated form; terms and rate changes require both parties

Quick reference

Abbreviations and what each one actually is

Term

Full name

What it means

Main limitation

BCO

Beneficial Cargo Owner

Cargo owner contracts directly with the carrier

MQC commitment and penalty exposure

NVOCC

Non-Vessel-Operating Common Carrier

Licensed consolidator reselling carrier space

HBL issued; shipper often shows the NVOCC

NAC

Named Account Contract

NVOCC contract bound to one named shipper

Only that name can use it

FAK

Freight All Kinds

Flat rate regardless of commodity

No peak space protection; resets at GRI

FIX

Fixed Rate

Rate locked for a set period

Rate inversion when the market falls

Commodity

Commodity Contract

Lower rate for one product category

Description must match exactly

Index-linked

Index-linked Contract

Index × agreed discount, reset periodically

Cost cannot be budgeted precisely

Spot

Spot Rate

Market rate for one sailing

Rolled and repriced in peak

MQC

Minimum Quantity Commitment

Annual volume you promise to move

Shortfall triggers penalty

SC

Service Contract

FMC-regulated US trade contract

Formal terms; changes require signatures

MBL / HBL

Master / House Bill of Lading

Carrier-issued vs NVOCC-issued

Shipper name differs between the two

NSA

NVOCC Service Arrangement

Contract between an NVOCC and its shipper, under 46 CFR Part 531

Only available from NVOCCs compliant with FMC requirements

FFA

Forward Freight Agreement

Financial derivative for hedging

Cannot be used to book cargo

If you only remember one line: BCO is the VIP lane, NVOCC is wholesale, FAK is retail, FIX is a bet on the future.

What this looks like from the China side

Most of what goes wrong with a US-bound contract does not originate at the contract. It originates at the point where the booking, the factory, the export declaration and the carrier's system have to agree with each other, and that point is on this side of the ocean.

A commodity description that does not match the contract. A shipper name on the HBL that does not match the consignee's expectation. A telex-release contract booked against an L/C. A factory that finishes production two days after the cutoff and pushes the whole chain into detention. These are not contract problems in the legal sense. They are execution problems, and they are invisible to an importer looking at a rate sheet from 7,000 miles away.

That is the part of the chain we handle directly: booking, export clearance, documentation review before the B/L is issued rather than after, and DDP execution into US and Canadian inland destinations. If you are comparing contract structures for a China-origin supply chain, the contract is the starting point — not the whole picture.

See our ocean freight services and China to US shipping routes for lane-level detail, or send us your lane and volume and we will tell you which contract structure fits your actual cargo pattern.

Frequently asked questions

Is a BCO contract always cheaper than going through an NVOCC?

No. A BCO contract is usually cheaper per container at equivalent volume, but it carries an MQC obligation, and in a falling market the contract rate can sit well above spot. For an importer moving under roughly 20–30 containers a year on a single lane, an NVOCC contract frequently produces a lower total cost once the MQC risk is priced in.

What is the difference between a service contract and a spot rate?

A service contract commits both sides: you commit to a minimum volume, the carrier commits to a rate and a service level, over a fixed period. A spot rate commits neither side to anything beyond a single sailing. On US trades, a service contract is filed with the FMC under 46 CFR Part 530; a spot booking is not.

What happens if I miss my MQC?

You owe a penalty calculated on the shortfall, using the coefficient written into the contract. Typical structures apply a percentage of the freight that would have been earned on the missing volume. The coefficient varies widely between carriers and is negotiable. It is the single most important number to confirm in writing before signature, and the one most shippers never ask about.

Can I use my forwarder's contract if I am not named on it?

No, if it is a named NVOCC contract or a NAC. Using a named contract for a shipper who is not the named party is contract misuse. When a carrier discovers it, the exposure falls on the cargo — which may be in transit at the time — as well as on the contract holder. The rate advantage is not worth the risk, and the risk is not limited to a fine.

Why is my company name not showing as shipper on the bill of lading?

Because the booking was made under an NVOCC contract, so the NVOCC issues a house bill of lading and typically appears as shipper. This is normal and legal, but it has downstream consequences: destination customs, letters of credit, and some buyer contracts all reference the shipper name. If your transaction requires your name to appear, that must be settled before booking — either through a dual-shipper structure or by switching to original terms under a contract that permits it.

When should I start negotiating a US service contract?

Preparation should be finished by the end of Q1. Negotiations on the Trans-Pacific typically open in mid-March, contracts take effect May 1, and carriers complete annual signatures by mid-May. Starting in April means negotiating against an allocation that has already been divided.

What is an NVOCC Service Arrangement?

An NSA is a contract between an NVOCC and its shipper under 46 CFR Part 531, in which the shipper commits to a minimum quantity and the NVOCC commits to a rate and service level — structurally similar to a service contract, but between an NVOCC and its customer rather than between a carrier and a shipper. Only NVOCCs compliant with the applicable FMC requirements can offer one.

Is an FFA the same as a freight contract?

No. A Forward Freight Agreement is a financial derivative that settles against a freight index. It is used to hedge rate exposure and cannot be used to book or move cargo. A contract that mentions an FFA as the basis for a booking is either confused or is not describing what it claims to describe.

One closing note on the numbers

Every dollar figure, day count and threshold in this article is a reference range drawn from published industry material and current market practice. They vary by carrier, by lane, by season and by year. The FMC definitions, the 30-day filing rule and the SCFI publication schedule are fixed and citable; the rates and free time figures are not.

Confirm every number against the carrier's current written contract before you commit cargo. A forwarder who will not put a term in writing does not have that term.

Core topics: ocean freight contracts explained, BCO vs NVOCC difference, what is a FAK rate in shipping, FIX contract ocean freight, NAC named account contract shipping, service contract FMC filing 2026, NVOCC service arrangement NSA, ocean freight contract renewal May 1, MQC minimum quantity commitment penalty, how to read an ocean freight quote

Planning a shipment on this lane? Get an itemised door-to-door quote from STU Supply Chain.

Canonical: https://stusupplychain.com/insights/ocean-freight-contracts-explained-bco-nvocc-fak-fix

STU Supply Chain is international freight agent and logistics supply chain management company.
Home
Copyright © 2021-2022 STU Supply Chain Management(Shenzhen)Co., Ltd.